Dispatch open · 24/7 storm and outage response --:--:-- local Before you dig, call 811
Rock RidgeInvestments LLC

Self-perform since 2009 · Seven divisions

The ground is the hard part. We self-perform all of it.

Outside plant fiber. Distribution to 34.5kV. Gas main under Part 192. Water, sewer, maxi-rig crossings, and the medium-voltage duct bank feeding a hyperscale campus. One contract, one superintendent, one safety record.

Divisions
07
Crews
48
States
09
Employees
640
TRIR
0.61
Section A–A · Typical joint-use corridor DWG RRI-STD-004 · NTS
Section A–A through a typical joint-use utility corridor A cross-section showing overhead 15kV primary and an ADSS fiber strand above grade, then below grade a communications duct bank, primary electric, gas main, water main and sanitary sewer, each drawn in its APWA locate color, with a horizontal directional bore passing beneath a road crossing. 288ct ADSS + 30' SLACK 15kV OVERHEAD PRIMARY EXISTING ROADWAY GRANULAR FILL STIFF CLAY WEATHERED SHALE 0' 2' 4' 6' 8' 10' COMM — 6-WAY 2" HDPE PWR — 750 MCM PRIMARY GAS — 6" PE MAIN WTR — 12" DUCTILE IRON SAN — 18" GRAVITY SEWER NEW HDD — 188 LF, 9' MIN COVER 0 10 FT
Fig. 01 — Corridor in section. Orange arc is the new bore. Tolerance zone applies to every facility shown
Aerial · transmission corridor · footage: Pexels

01 Dispatch Shift 06:30–17:00 · 48 crews assigned

What the board looks like right now.

Forty-eight crews, seven divisions, nine states. Every one of them is a Rock Ridge employee on a Rock Ridge tailboard. This is the client-facing view.

Field operations — live Illustrative board · 6 of 48 rows shown
CREW 14 Make-ready transfers, spans 118–124 OTMR window · 2,600-pole app 72% Aerial
CREW 07 Pilot bore 640 of 1,340 LF under SR 11 330k rig · walkover steering 48% Drilling
CREW 22 2″ MDPE main + 6 services, Sta 12+50 DIMP bare-steel replacement 61% Fusing
CREW 03 Duct bank pour, gen yard feeder A 34.5kV · concrete-encased, red dye 35% Forming
CREW 19 QL-A test holes ahead of Crew 07 14 of 16 verified · offsets logged 88% Potholing
CREW 31 Padmount set + primary termination, Lot 40 200A elbows · EPZ established 54% Energizing
Row colour is the APWA locate colour of the facility being built Updated at each tailboard and each hold point

02 Divisions 7 units · one crew list · one OQ matrix

Seven divisions, one crew list.

We do not broker the work out and hope. Every division is staffed with Rock Ridge employees, running Rock Ridge iron, on one safety program.

01

Broadband & Fiber Orange · communications

Outside plant end to end: pole applications and make-ready through strand, lash, splice and bidirectional OTDR closeout. FTTH, MDU, middle mile, hut and cabinet integration.

  • OTMR make-ready
  • Strand & lash
  • ADSS
  • FDH / MST
  • Tier 2 test
02

Power Delivery Red · electric

Overhead and underground distribution to 34.5kV, URD conversions, padmount and switchgear setting, substation civil, and a storm organization that mobilizes in under twelve hours.

  • NESC framing
  • URD
  • Reconductor
  • Substation civil
  • Mutual aid
03

Gas & Pipeline Yellow · gas, oil, steam

MDPE and steel distribution under 49 CFR Part 192, DIMP-driven cast iron and bare steel replacement, station piping, ILI anomaly digs, and cathodic protection.

  • OQ covered tasks
  • Electrofusion
  • Stopple / hot tap
  • Integrity digs
  • CP survey
04

Water & Wastewater Blue & green · potable, sewer

AWWA C900 PVC and ductile iron main, wet taps and line stops, gravity sewer and force main, CIPP rehabilitation, lift stations, and PACP-coded condition assessment.

  • C600 testing
  • C651 disinfection
  • CIPP
  • Pipe bursting
  • I&I programs
05

Heavy Civil & HDD Graphite · the ground itself

Fourteen drills from 20,000 to 330,000 pounds of pullback. Designed profiles, calculated pullback loads, mud recycling, rock reaming, jack-and-bore casing, and full restoration.

  • ASTM F1962
  • Rock reaming
  • Jack & bore
  • Mud recycling
  • Hydro-vac
06

Data Centers — Hyperscale White · proposed excavation · new

Campus underground from the property line in: medium-voltage duct bank and precast manholes, generator yard and fuel, chilled water, and diverse A/B fiber entrances to the meet-me room.

  • 34.5kV duct bank
  • Gen yard
  • A/B entrances
  • Chilled water
  • Speed to power
07

Survey, SUE & Damage Prevention Pink · survey · the one the other six depend on

Route survey and subsurface utility engineering to ASCE 38-22 quality levels D through A, private locating, vacuum potholing, ticket and positive-response management under CGA Best Practices, and record delivery per ASCE 75-22. When the locate crew and the bore crew answer to the same superintendent, the conflict gets found before the drill does.

  • ASCE 38-22 QL-A/B
  • CGA Best Practices
  • Positive response
  • Test holes
  • ASCE 75-22 records
  • GIS delivery

03 Locate code APWA uniform colour code

Everything here is somebody's facility.

The colours on this site are not a brand palette. They are the APWA uniform colour code — the paint language every locator marks on the ground before a shovel moves. Every division, board row, and project on these pages carries the colour of what it is actually made of.

Read the drawing at the top of the page. That is a typical joint-use corridor in section, and every facility in it is somebody's asset, somebody's outage, and somebody's claim if we get it wrong. The orange arc under the roadway is the new bore — nine feet of cover, under everything already in the ground.

APWA locate colours and the division that works in each
ColourMarksDivision
OrangeCommunications, CATV, fiber, conduit01 Broadband
RedElectric power, cable, conduit02 Power
YellowGas, oil, steam, petroleum03 Gas
BluePotable water04 Water
GreenSewer and storm drain04 Wastewater
PinkTemporary survey markings07 Survey & SUE
WhiteProposed excavation route06 Data centers

04 Field 4 aerial clips · 4 frames · openly licensed, see colophon

Aerial 01
Street cut, traffic control in placeBarriers set, machine inside the closure
Aerial 02
Restoration inside the closureCompaction before pavement goes back
Aerial 03
Open cut, top-downSpoil managed, materials staged
Aerial 04
Lattice tower, conductors leavingRight-of-way kept clear below
A tracked horizontal directional drill set up on a highway shoulder with a rack of drill rod loaded, an orange locate flag planted beside the entry point
Entry side, rod loadedFlags set before the pilot bore
A dome-style fiber optic splice closure mounted in a vault with several armored cables entering through the base seals
Splice closureDressed in, sealed, re-entered
A bank of grey PVC conduits held on plastic spacers in an open trench, tied to rebar and ready for concrete encasement
Duct bank, spacers setRacked and tied for the pour
Two line workers at the top of a wood H-frame structure changing out a crossarm, conductors sweeping away against a clear sky
Crossarm change-outEverything grounded

05 Production & method Trailing twelve months

Measured by the foot, the pole, and the pass.

Production numbers a superintendent would recognize, and the six steps every job runs in, mapped to CGA Best Practices.

Fiber placed TTM1,970route miAerial and underground, all programs
Directional bore TTM412,000LFAll drill classes, all divisions
Gas services replaced TTM6,300+Under operator DIMP programs
Tickets closed clean TTM99.2%No facility damage on the ticket
  1. Walk & survey

    Route walk with the owner, topographic survey, constructability review, and permit strategy before a number is priced.

  2. Design & permit

    Make-ready and pole loading, plan-and-profile, bore profiles, DOT and Class I railroad permits, MOT and erosion plans.

  3. Locate & verify

    Ticket filed, statutory wait observed, positive response confirmed, and every crossing potholed to QL-A before iron moves dirt.

  4. Construct

    Self-perform crews, a hazard analysis built at the tailboard by the people doing the work, and one foreman accountable for the site.

  5. Test & restore

    Hydrostatic, OTDR, or energization testing, then compaction, pavement, and landscape returned to the condition we found.

  6. Record

    Facilities captured with survey-grade GNSS in the open trench and delivered to the owner's GIS within ten business days.

Why step three has its own crews

Excavation damage is the largest single driver of injury, outage, and claim cost in this industry, and the CGA's DIRT data says most of it traces to locating and excavation practice — not bad luck. So locating is production work here, with its own crews, trucks, and line on the schedule.

Self-perform, and what it buys the owner

One contract, one superintendent, one EMR. When the bore hits rock at 4 p.m., the rock reamer is ours and it is on site the next morning — not three weeks out on a subcontractor's schedule.

06 Markets ~75% of revenue under multi-year MSAs

Owners, not middlemen.

Roughly three quarters of revenue runs through multi-year master service agreements. We would rather be the crew an owner keeps than the low bid they regret.

Markets served
SectorWhoThe work
Telecom Carriers, ISPs & rural cooperatives Middle-mile and last-mile under BEAD and state broadband programs, with the passing-level evidence and reporting those programs audit against built into the work.
Power Investor-owned utilities & electric co-ops Blanket distribution work, hardening and undergrounding programs, and mutual-aid storm restoration across the Southeast and Gulf.
Energy Gas LDCs & midstream operators Cast iron and bare steel replacement on a regulatory clock, meter set relocations, station work, and integrity digs under operator qualification.
Hyperscale Data center developers & EPCs Campus underground on a speed-to-power schedule: medium-voltage duct bank, generator yard, and diverse carrier entrances, sequenced against the shell and the switchgear delivery date.

07 Safety & damage prevention CGA · NUCA · ISNetworld A · Veriforce OQ

Everybody goes home. That is the whole program.

Any employee can stop any job, at any time, for any reason, without asking anyone. Nobody here has ever been disciplined for a stop-work call — and there were 214 of them in the last twelve months.

Day one, every new operator

You do not get a second chance at a bore that finds a 12-inch main. So we find it first, on purpose, with a shovel.

Standing rule, Heavy Civil & HDD

Safety metrics, trailing twelve months
MetricValueDefinition
TRIR0.61Total recordable incident rate. NAICS 237130 average is 2.3.
DART0.28Days away, restricted, or transferred.
EMR0.74Experience modification rate, current policy year.
Stop-work214Calls made by crew members, trailing twelve months.
A concrete sidewalk with a diagonal row of six patched vacuum-excavation test holes, surrounded by orange, red and yellow utility locate paint marks
Six test holes, one crossingDepth and offset logged at each

08 Selected work 3 of 7 profiles

Three jobs worth showing.

Every project ran under a Rock Ridge superintendent with Rock Ridge crews from notice-to-proceed through record drawings.

MIDDLE MILE — 118 ROUTE MI
RRI-P-0118 · Route schematic
Broadband

Ridgeline Rural Broadband

Middle-mile backbone and four distribution laterals reaching 4,180 previously unserved passings. Make-ready on 2,600 poles ran concurrent with underground on the two laterals with no pole line to use.

Owner
Regional electric cooperative
Scope
118 route mi · 62 mi aerial
Delivered
5 weeks ahead of the grant milestone
ENTRY 12° 1,340 LF CROSSING · 38' COVER
RRI-P-0142 · Bore profile
Gas & HDD

Caldwell River Crossing

Single-pass drill of 12-inch steel transmission beneath a navigable river and an active rail spur. Designed profile, staged inadvertent-return response on both banks, pullback inside one 14-hour window.

Owner
Gas transmission operator
Scope
1,340 LF HDD · 12" steel
Result
No inadvertent returns, no lost time
DATA HALL ENTRANCE A ENTRANCE B GEN YARD + 34.5kV
RRI-P-0191 · Campus plan
Hyperscale

Cedar Flats Campus, Phase 1

Campus underground for a 96 MW build: medium-voltage duct bank from the utility service entrance to two switchgear pads, generator yard feeders and fuel, and physically diverse carrier entrances to the meet-me room.

Owner
Hyperscale developer, via EPC
Scope
34.5kV duct bank · 62 precast manholes
Result
Energization milestone held

09 Next step Response within one business day

Send us the route. We'll walk it.

Tell us the corridor, the scope, and the in-service date. You will hear from somebody who has actually stood in a trench — usually within one business day.

Direct lines
Estimating[email protected]
24/7 dispatch1-800-555-0184
Damage reporting1-800-555-0199
Vendors & subs[email protected]