Seven self-perform divisions that share a dispatch board, one safety program, and one operator-qualification matrix. Most of our work pulls at least three of them onto the same job.

Divisions
07
Crews
48
Self-performed
84%
Bonding, single
$45M
Aerial · lattice tower · footage: Pexels

01 Broadband & Fiber Orange · communications

Broadband & Fiber

We build outside plant end to end: pole applications and make-ready through strand, lash, placement, splice, test, and turn-up. Our splicers carry their own fusion sets and OTDRs, and they close out the job with the trace — not a promise to send it later.

Underground is the same crew list. Directional bore, plow, trench, or rock saw depending on what the ground gives us, with vaults, handholes, and pedestals set to the owner's standard and restored to grade.

For grant-funded builds — BEAD, RDOF, state broadband offices — we deliver the passing-level documentation and photo evidence the program requires as part of the build, because retrofitting that record after the fact never works.

Fig. 02 · FTTH distribution, single feederRRI-STD-021
HUB / OLT FDH 432 FDH 432 FDH 288 LAST DROP
Loss budget verified bidirectionallyTier 2 OTDR at closeout

Scope of work

  • Pole applications & make-ready engineering
  • Pole replacement & transfers
  • Strand, lash & overlash
  • ADSS placement
  • Directional bore & plow
  • Vault, handhole & cabinet setting
  • Fusion splicing & termination
  • OTDR & power meter testing
  • FTTH drops & ONT install
  • MDU riser & in-building
  • Hut, node & cabinet integration
  • Emergency fiber restoration
Broadband division capacity
CapabilityCapacity
Aerial crews14
Underground crews11
Splice & test technicians22
Typical aerial production4,000 ft / day
Typical bore production900 ft / day
Restoration turnaround≤ 4 hrs on call

02 Power Delivery Red · electric

Power Delivery

Distribution work on blanket and unit-price agreements: new construction, pole change-outs, reconductoring, URD conversions, transformer and switchgear setting, and secondary services. Our line crews work energized to 15kV under a qualified-worker program with annual re-certification.

Storm is not a side business. We hold pre-positioned mutual-aid agreements and can put twelve crews on the road within twelve hours of a call, with fuel, lodging, and logistics handled by our own storm coordinator so the host utility does not have to manage us.

On the civil side we self-perform substation grading, foundations, grounding grids, duct banks, and control building pads — which keeps the schedule in one place when the equipment delivery date moves.

Scope of work

  • Overhead distribution to 15kV
  • Underground residential distribution
  • OH-to-UG conversions
  • Pole setting & change-out
  • Reconductoring
  • Transformer & switchgear setting
  • Secondary & service drops
  • Street & area lighting
  • Substation civil & grounding
  • Duct bank & manhole systems
  • EV charging infrastructure
  • Storm & outage restoration

Mobilization commitment

Twelve crews on the road within twelve hours of a mutual-aid call. Self-sufficient for the first seventy-two hours: fuel, water, lodging, and mechanics travel with the convoy.

03 Gas & Pipeline Yellow · gas, oil, steam

Gas & Pipeline

Distribution mains and services in PE and steel, meter set installation and relocation, and the cast iron and bare steel replacement programs that most LDCs are running against a regulatory clock. Every task that touches a covered facility is performed by an operator-qualified employee, and the OQ record travels with the crew on the tablet.

Integrity work — excavation and exposure for ILI anomaly digs, coating repair, recoating, composite sleeve installation, and backfill under an inspector's hold points, with NDT coordination handled by us.

We also self-perform cathodic protection: anode bed installation, test station setting, rectifier installation, and annual survey.

Scope of work

  • PE & steel distribution mains
  • Service lines & meter sets
  • Cast iron / bare steel replacement
  • Keyhole & vacuum excavation
  • Tie-ins & stopples
  • Station & regulator piping
  • ILI anomaly & integrity digs
  • Coating & recoating
  • Cathodic protection systems
  • Leak survey support
  • Purging & commissioning
Gas division qualifications
QualificationStatus
Operator qualification (ASME B31Q)All covered-task personnel
DOT 192 subpart N complianceProgram audited annually
Fusion technicians64 qualified
API 1104 welders18 on roster
ISNetworld / AvettaActive, grade A

04 Water & Wastewater Blue Green

Water & Wastewater

Water main installation and replacement in ductile iron, PVC, and HDPE, including hot taps, line stops, valve and hydrant setting, service transfers, and the pressure, chlorination, and bacteriological testing that has to pass before anybody gets water back.

On the wastewater side we install gravity sewer and force main, rehabilitate existing collection systems with cured-in-place lining and manhole coating, and build lift stations complete with wet well, piping, and controls.

Inflow-and-infiltration programs get the full sequence: flow monitoring, smoke and dye testing, CCTV inspection with NASSCO-coded reporting, then targeted rehabilitation ranked by return on the dollar.

Scope of work — water

  • DI, PVC & HDPE main
  • Directional bore & pipe bursting
  • Hot taps & line stops
  • Valve, hydrant & vault setting
  • Service transfers
  • Pressure, chlorination & bac-t testing
  • Meter replacement programs

Scope of work — wastewater

  • Gravity sewer & force main
  • CIPP lining
  • Manhole rehabilitation & coating
  • Lift station construction
  • Bypass pumping
  • CCTV & NASSCO coding
  • Smoke & dye testing
  • I&I reduction programs

05 Heavy Civil & HDD Graphite

Heavy Civil & HDD

This is the division the other five call when the ground says no. Fourteen directional drills from 20,000 to 330,000 pounds of pullback, rock trenchers, bore-and-jack, and a mud recycling spread that keeps the crossing clean and the neighbors calm.

Crossings are engineered, not attempted. Every bore over 300 feet or under a sensitive feature gets a designed profile, a calculated pullback load, a frac-out contingency plan on site, and a bore log kept in real time. Inadvertent returns are a design failure, so we design against them.

We finish what we open: compaction testing, pavement replacement to DOT spec, curb and sidewalk, seed and straw or sod, and a punch walk with the inspector before we demobilize.

Fig. 03 · Designed bore profileRRI-STD-033
ENTRY 11° EXIT 9° MIN COVER 22' ENTRY PIT EXIT PIT DESIGNED PROFILE · PULLBACK LOAD CALCULATED · BORE LOG KEPT LIVE
Frac-out contingency on site before spudASTM F1962

Scope of work

  • Horizontal directional drilling to 24"
  • Rock trenching & sawing
  • Bore & jack, auger bore
  • Road, rail & waterway crossings
  • Vacuum & hydro excavation
  • Open cut & shoring
  • Duct bank & conduit systems
  • Mud recycling & disposal
  • Pavement & concrete restoration
  • Erosion control & seeding
Drill fleet
ClassPullbackUnits
Compact / urban20,000 lb6
Midsize40–100,000 lb5
Maxi150–330,000 lb3
Rock saw / trencher—9
Vacuum excavator—17

06 Data Centers — Hyperscale White · proposed excavation

Data Centers — Hyperscale

White is the locate colour for a route nobody has dug yet. That is every hyperscale campus before we get there — a graded pad, a property line, and an energization date somebody has already promised a tenant.

Our scope starts at the utility service entrance and stops at the building. We are not the GC and we are not the electrical contractor inside the white space. We are the campus underground: medium-voltage duct bank and precast manholes out to the switchgear pads, generator yard feeders and double-wall fuel piping, the fused chilled water loop, the site fire main, and the two physically diverse carrier entrances that land in the meet-me room.

Speed to power is not a slogan on this work, it is the schedule. Our duct bank sits on the critical path between the utility interconnect and the first switchgear pad, and it has to be poured, proofed, and surveyed before the cable pull is released — which has to finish before commissioning can start. We sequence against the switchgear delivery date, not the shell.

Diversity you can actually defend. Two entrance paths, physically separated by a surveyed distance for their entire run, each with its own handhole chain and its own record drawing. The whole point is that one careless excavator cannot take both. We know precisely how that failure happens, because preventing it is Division 07's day job.

Fig. 04 · Campus underground, plan · Phase 1RRI-DC-011
Hyperscale campus underground, plan view Plan of a data center campus showing the utility service entrance, medium-voltage duct bank running to two switchgear pads, the data hall and meet-me room, a generator yard, and two physically diverse fiber entrance paths approaching from opposite corners. SERVICE ENTRANCE 34.5kV SWGR A SWGR B CONCRETE-ENCASED DUCT BANK PRECAST MH, 400' CENTERS DATA HALL 96 MW CRITICAL MMR ENTRANCE A ENTRANCE B SEPARATION SURVEYED GENERATOR YARD — N+1, DOUBLE-WALL FUEL
Every run surveyed open, before the pourSeparation distance stated, not asserted

Scope of work

  • Medium-voltage duct bank, concrete-encased
  • Precast manholes, handholes & pull boxes
  • MV cable pulling & terminations
  • Switchgear & transformer pads
  • Generator yard feeders & control conduit
  • Double-wall fuel oil piping & day tank interconnect
  • Fused HDPE chilled & condenser water
  • Site fire loop, hydrants, PIVs & backflow
  • Domestic water & site sewer
  • Ground ring & lightning protection grounding
  • Diverse A/B carrier entrances & innerduct to the MMR
  • Campus interconnect ring
  • Temporary construction power
  • SWPPP, grading & restoration
Typical MV package
34.5kV or 13.8kV feeders in concrete-encased, red-dyed duct bank. Precast manholes on roughly 400-foot centers, every duct mandrel-proofed with a pull string left in.
Entrance diversity
Two paths, separated for the full run, each with its own handhole chain, conduit count, and record drawing. The separation distance is surveyed and stated — not asserted in a submittal.
Mechanical
HDPE DR-11 chilled and condenser water, butt-fused with recorded fusion data logs, hydrostatically tested before backfill.
Sequencing
Built backward from the energization milestone and the switchgear delivery date. Duct bank is surveyed and closed out before the cable pull is released.
Records
Every run captured with survey-grade GNSS in the open trench, delivered in the owner's CAD and GIS standard inside ten business days.
Who we work for
Developers and their EPC or design-build GC, usually as a direct site-utilities trade contract rather than a sub-tier.
A long open trench running toward a building, carrying a bank of conduits held apart on spacers along its full length
Duct bank run to the buildingSurveyed open, before backfill

07 Survey, SUE & Damage Prevention Pink · survey

Survey, SUE & Damage Prevention

The division that decides whether the other five have a good day. Route survey and topographic mapping, subsurface utility engineering to ASCE 38 quality levels D through A, private locating, potholing, permitting, and GIS as-built delivery.

We keep this in house on purpose. When the locate crew and the bore crew answer to the same superintendent, the conflict gets marked, potholed, and drawn before the drill arrives instead of getting discovered by the drill.

As-builts are captured with survey-grade GNSS at the time of installation — open trench, not from memory — and delivered in the owner's schema, whether that is Esri, a landbase CAD standard, or a flat file the operator can actually load.

Scope of work

  • Route & topographic survey
  • Subsurface utility engineering QL-D through QL-A
  • Private utility locating
  • Vacuum potholing & test holes
  • 811 ticket management
  • DOT, county & railroad permitting
  • Environmental & erosion permitting
  • Traffic control planning
  • GPS as-built capture
  • GIS data delivery & QA
QL-D
Records research. Existing plans, one-call records, and operator maps compiled.
QL-C
Surface survey of visible features — valves, pedestals, manholes — correlated to records.
QL-B
Designating. Geophysical location of the horizontal position of existing facilities across the whole corridor.
QL-A
Locating. Exposure and survey of the actual facility — size, material, condition, and elevation to the hundredth.

08 Common questions Short answers · longer ones from a human at the number in the footer

What owners usually ask first.

How much of the work do you actually self-perform?
Across the last three fiscal years, 84 percent of contract value was performed by Rock Ridge employees. We subcontract specialty items — NDT, asphalt paving in some markets, arborist work — and we tell you which ones at bid time rather than after award.
Do you take unit-price master service agreements?
Yes, and we prefer them. About three quarters of revenue runs through multi-year MSAs with unit-price schedules. We will also bid lump sum, design-build, and time-and-material for emergency work.
What is your bonding capacity?
Single project capacity of $45 million and aggregate capacity of $180 million through an A-rated treasury-listed surety. Bonding letters are issued on request during prequalification.
Can you work in an active right-of-way with other contractors?
Routinely. Joint trench coordination, shared traffic control, and a single point of contact with the DOT or municipality are normal parts of our work. Our superintendents run the coordination meeting when nobody else volunteers.
How fast can you mobilize for emergency work?
Fiber restoration crews respond within four hours of a call in our core markets. Storm crews mobilize within twelve hours of a mutual-aid request and arrive self-sufficient for the first seventy-two.

09 Next step Response within one business day

Bring us the hard part of the route.

The crossing nobody wants to price, the block with five existing utilities, the pole line that needs make-ready yesterday. That is the work we are built for.

Prequalification package

Insurance certificates, EMR letter, safety statistics, bonding letter, OQ and certification matrix, equipment schedule, and three owner references — sent as one package within two business days of request.